Skip to content

Converts tests to Swift Testing #54

Converts tests to Swift Testing

Converts tests to Swift Testing #54

Triggered via pull request September 19, 2025 05:30
Status Cancelled
Total duration 43m 43s
Artifacts

test.yaml

on: pull_request
Matrix: test / linux
Fit to window
Zoom out
Zoom in

Annotations

16 errors
lint / Format linting
Process completed with exit code 1.
test / Test on Linux - swift:6.0-noble
Process completed with exit code 1.
test / Test on Linux - swift:6.2-noble
The operation was canceled.
test / Test on Linux - swift:6.2-noble
The strategy configuration was canceled because "test.linux.swift_6_0-noble" failed
test / Test on Linux - swift:6.2-jammy
The operation was canceled.
test / Test on Linux - swift:6.2-jammy
The strategy configuration was canceled because "test.linux.swift_6_0-noble" failed
test / Test on Linux - swift:6.1-jammy
The operation was canceled.
test / Test on Linux - swift:6.1-jammy
The strategy configuration was canceled because "test.linux.swift_6_0-noble" failed
test / Test on Linux - swift:6.1-noble
The operation was canceled.
test / Test on Linux - swift:6.1-noble
The strategy configuration was canceled because "test.linux.swift_6_0-noble" failed
test / Test on Linux - swift:6.0-jammy
The operation was canceled.
test / Test on Linux - swift:6.0-jammy
The strategy configuration was canceled because "test.linux.swift_6_0-noble" failed
test / Test on macOS
The operation was canceled.
test / Test on macOS
The run was canceled by @NeedleInAJayStack.
test
The run was canceled by @NeedleInAJayStack.
test
The run was canceled by @NeedleInAJayStack.