Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathoptimization.mod
175 lines (123 loc) · 6.07 KB
/
optimization.mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
# This file contains the model for Phase 2 of IEMS 313 SmartRail project.
#
# Author: Jason Lu, Rhea Shah, Hugo Zhang, Gabe Bider
# Date: May 29, 2023
# ================
# SETS
# ================
# The set of stations.
set stations;
# The set of tracks (directed).
set tracks within (stations cross stations);
# The set of shipments.
set shipments;
# The set of biweekly days.
set days;
# The reverse set of tracks (Used to create bi-directional tracks in AMPL)
set tracks_reverse within (stations cross stations);
# ================
# Parameters
# ================
# The length of each track (in miles).
param x_coord {stations};
param y_coord {stations};
param len_track{(i,j) in tracks} := sqrt((x_coord[i]-x_coord[j])^2 + (y_coord[i]-y_coord[j])^2);
# The number of reloading zones at each station.
param num_reload {stations};
# The reloading cost per container.
param cost_reload;
# The shipping cost per container per mile.
param cost_ship;
# Capacity per train/track in a day.
param capa_track;
# Capacity per reloading zone in a day.
param capa_reload;
# Number of days in the biweekly schedule
param T;
# Daily late penalty fee per shipment
param cost_penalty;
# Daily amortized cost for building a new track
param cost_track;
# Daily amortized cost for building a new reloading station
param cost_new_reload;
# Max number of reload stations per station
param max_reload;
# Max number of tracks between two stations
param max_tracks;
# The origins, destinations, and volumes of the shipments.
param orig {shipments} within stations;
param dest {shipments} within stations;
param volume {shipments};
# Days when shipments become available for pickup and should be delivered
param avail_day {shipments};
param deliv_day {shipments};
# ================
# Variables
# ================
# The number of containers traversed along track from station i
# to station j belonging to shipment k on day d.
var N{tracks, shipments, days} integer >= 0;
# The number of new tracks between station i and station j
var new_tracks{tracks} integer >= 0;
# The number of new reloading zones constructed at station i
var new_reload_zones{stations} integer >= 0;
# The number of containers picked up from station i for shipment k on day d
var pickup{stations, shipments, days} integer >= 0;
# The number of containers delivered to station i for shipment k on day d
var deliver{stations, shipments, days} integer >= 0;
# Binary variable keeping track if d is less than or equal to deliv_day for shipment k
var late{shipments, days} binary >= 0;
# Used for checking the objective value.
var total_ship_cost = sum {(i,j) in tracks, k in shipments, d in days} cost_ship * len_track[i,j] * N[i,j,k,d];
var new_tracks_cost = sum {(i,j) in tracks_reverse, d in 1..T} cost_track * new_tracks[i,j] * len_track[i,j];
var new_reloads_cost = sum {i in stations, d in days} cost_new_reload * new_reload_zones[i];
var total_late_cost = sum {(i,j) in tracks, k in shipments, d in days} cost_penalty * N[i,j,k,d] * late[k,d];
# ================
# Obj. Func
# ================
# We aim to minimize the total cost, including the shipping cost, amortized tracks cost,
# new reloading station cost, and late penalty cost.
minimize total_cost:
total_ship_cost + new_tracks_cost + new_reloads_cost + total_late_cost;
# ================
# Constraints
# ================
# new_tracks[i,j] should be equal to new_tracks[j,i] for all i,j
subject to track_equality {(i,j) in tracks}:
new_tracks[i,j] = new_tracks[j,i];
# The max number of tracks existing between two stations is at most max_tracks
subject to track_limit {(i,j) in tracks}:
new_tracks[i,j] + 1 <= max_tracks;
# The max number of reloading stations existing at a station is at most max_reload
subject to reload_station_limit {i in stations}:
new_reload_zones[i] + num_reload[i] <= max_reload;
# The number of containers traversed along every track in either direction per day
# should not exceed the track capacity.
subject to track_capa_limit {(i,j) in tracks, d in days}:
sum{k in shipments} (N[i,j,k,d] + N[j,i,k,d]) <= capa_track * (new_tracks[i,j] + 1);
# The number of containers entering a station per day
# should not exceed the reloading zones capacity.
subject to reload_capa_limit {j in stations, d in days}:
sum{(i,j) in tracks, k in shipments} N[i,j,k,d] <= capa_reload * (new_reload_zones[j] + num_reload[j]);
# No containers should be shipped before the availability day
subject to availability_constraint {k in shipments}:
sum{(i,j) in tracks, d in days : d < avail_day[k]} N[i,j,k,d] = 0;
# The containers picked up for each shipment must equal the total volume
subject to required_pickup {k in shipments, j in stations}:
sum{d in avail_day[k]..T-1} pickup[j,k,d] = if orig[k] == j then volume[k] else 0;
# The containers delivered for each shipment must equal the total volume
subject to required_delivery {k in shipments, j in stations}:
sum{d in avail_day[k]..T-1} deliver[j,k,d] = if dest[k] == j then volume[k] else 0;
# The containers leaving an origin station must equal the containers picked up on that day (ensures containers start moving)
subject to containers_leave_origin {i in stations, k in shipments, d in avail_day[k]..T-1}:
sum{(orig[k],j) in tracks} N[orig[k],j,k,d] * (if orig[k] == i then 1 else 0) = pickup[i,k,d];
# The containerrs arriving at a destination station must equal the containers delivered on that day (ensures containers start moving)
subject to containers_arrive_destination {i in stations, k in shipments, d in avail_day[k]..T-1}:
sum{(j,dest[k]) in tracks} N[j,dest[k],k,d] * (if dest[k] == i then 1 else 0) = deliver[i,k,d];
# Containers that are delivered past the deliv_day for a shipment are considered late
subject to deliv_late {k in shipments, d in 1..T}:
late[k,d] = if d < deliv_day[k] then 0
else 1;
# The number of containers entering and leaving a station are balanced.
subject to flow_consistency {k in shipments, g in stations, d in days: d < T}:
sum {(i,g) in tracks} N[i,g,k,d] + pickup[g,k,d+1] = sum {(g,j) in tracks} N[g,j,k,d+1] + deliver[g,k,d];