Skip to content

Add Copilot instructions for dbt-sqlserver adapter #4

Add Copilot instructions for dbt-sqlserver adapter

Add Copilot instructions for dbt-sqlserver adapter #4

Triggered via push September 29, 2025 03:18
Status Failure
Total duration 57s
Artifacts
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Unit tests (3.13)
Process completed with exit code 1.
Unit tests (3.11)
The operation was canceled.
Unit tests (3.11)
The strategy configuration was canceled because "patched-unit-tests._3_13" failed
Unit tests (3.12)
The operation was canceled.
Unit tests (3.12)
The strategy configuration was canceled because "patched-unit-tests._3_13" failed