Skip to content

This PR implements Steps 7 and 8 in [this doc](https://docs.google.com/document/d/1S2v_sGsBngCRqDLuIhxtZqyEMs2InC_DFoRDv3OW1PI/edit). "Ignore p/r" #190

Closed as not planned
@will8683

Description

@will8683

This PR implements Steps 7 and 8 in this doc.

  • VerifyContractData.s.sol reports on critical data within contracts (which will likely require manual verification)
  • UpgradePortal performs an upgrade to a new version of OptimismPortal to enable fault proofs

Originally posted by @nadir-akhtar-coinbase in #187

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions