Under 4 Fundamental Concepts and assumptions 4.1.4 is not complete, needs more work
Table 4.1.4.1.4.B and Table 4.1.4.1.5.B
are used in Validation Service and need review.
Example: The services, ie water, electricity, telecom, etc... are part of the Road as they serve the road.
In my humble opinion: An IfcRoad should be able to contain one or several IfcFacilityPartCommon with the relevant services as part of the road facility.
The text was updated successfully, but these errors were encountered:
Under 4 Fundamental Concepts and assumptions 4.1.4 is not complete, needs more work
Table 4.1.4.1.4.B and Table 4.1.4.1.5.B
are used in Validation Service and need review.
Example: The services, ie water, electricity, telecom, etc... are part of the Road as they serve the road.
In my humble opinion: An IfcRoad should be able to contain one or several IfcFacilityPartCommon with the relevant services as part of the road facility.