You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Now all project directories are at the top-level. This implies, and this is also reflected in the readme file, that all top-level directories in the repository are considered to be project directories (with the exception of the batches directory). There are some drawbacks to this:
If we add a directory that is not a project directory then we need to document this
Scripts that are looking for project directories have to rely on some heuristics like "is there a process.py file" or is there a "golds" directory, which are a bit fragile.
Once we get a lot more projects then the top-level directory gets to be quite crowded and navigation will get harder.
If there are no major repercussions for existing scripts then I would like to add a "projects" directory.
Done when
No response
Additional context
No response
The text was updated successfully, but these errors were encountered:
Because
Now all project directories are at the top-level. This implies, and this is also reflected in the readme file, that all top-level directories in the repository are considered to be project directories (with the exception of the
batches
directory). There are some drawbacks to this:If there are no major repercussions for existing scripts then I would like to add a "projects" directory.
Done when
No response
Additional context
No response
The text was updated successfully, but these errors were encountered: