Skip to content

Latest commit

 

History

History
37 lines (23 loc) · 920 Bytes

README.md

File metadata and controls

37 lines (23 loc) · 920 Bytes

INA-Segmenter for CLAMS

Description

This is a CLAMS app that wraps the inaSpeechSegmenter tool.

User instruction

General user instructions for CLAMS apps is available at CLAMS Apps documentation.

System requirements

  • libsndfile
  • ffmpeg

On Ubuntu, you can install these by

apt install ffmpeg libsndfile1

For other OSs, please refer to the supported package managers to install system libraries.

Python packages

Install dependencies using requirements.txt.

pip install -r requirements.txt

If you encounter an AttributeError from module 'keras.utils.generic_utils', you might need to re-install tensorflow after deleting keras.

pip uninstall -y keras keras-nightly
pip install --upgrade --force-reinstall $(grep tensorflow requirements.txt)