Skip to content

Latest commit

 

History

History
98 lines (63 loc) · 3.82 KB

File metadata and controls

98 lines (63 loc) · 3.82 KB
layout classes title date
posts
wide
Distil Whisper Wrapper (v1.2)
2024-08-08 15:48:34 +0000

About this version

About this app (See raw metadata.json)

The wrapper of Distil-Whisper, avaliable models: distil-large-v3, distil-large-v2, distil-medium.en, distil-small.en. The default model is distil-small.en.

Inputs

(Note: "*" as a property value means that the property is required but can be any value.)

One of the following is required: [

]

Configurable Parameters

(Note: Multivalued means the parameter can have one or more values.)

  • modelSize: optional, defaults to distil-small.en

    • Type: string
    • Multivalued: False
    • Choices: distil-large-v3, distil-large-v2, distil-medium.en, distil-small.en, small, s, medium, m, large-v2, l2, large-v3, l3

    The size of the model to use. There are four size of model to use distil-large-v3, distil-large-v2, distil-medium.en, distil-small.en. You can also enter the abbreviation of the model as parameter. 'small' and 's' for distil-small.en; 'medium' and 'm' for distil-medium.en; 'large-v2' and 'l2' for distil-large-v2; 'large-v3' and 'l3' for distil-large-v3. The default model is distil-medium.en.)

  • pretty: optional, defaults to false

    • Type: boolean
    • Multivalued: False
    • Choices: false, true

    The JSON body of the HTTP response will be re-formatted with 2-space indentation

  • runningTime: optional, defaults to false

    • Type: boolean
    • Multivalued: False
    • Choices: false, true

    The running time of the app will be recorded in the view metadata

  • hwFetch: optional, defaults to false

    • Type: boolean
    • Multivalued: False
    • Choices: false, true

    The hardware information (architecture, GPU and vRAM) will be recorded in the view metadata

Outputs

(Note: "*" as a property value means that the property is required but can be any value.)

(Note: Not all output annotations are always generated.)