-
-
Notifications
You must be signed in to change notification settings - Fork 179
Open
Description
This should be checked in a test: TODO.end = TODO.start if no DURATION/DUE is given
- create a test that checks this case
- change code if needed
Context: The RFC makes a statement about the Event but there is nothing about the TODO. I doubt though that the TODO is endless but I do not know.
@tobixen - you work more with TODOs. It is a case that TODOs have only a DTSTART. What is the expected end of such a TODO? The same as the start or is it endless? (None)
Originally posted by @niccokunzmann in #896 (comment)
Metadata
Metadata
Assignees
Labels
No labels