Skip to content

Laravel 13.x Compatibility #67

Laravel 13.x Compatibility

Laravel 13.x Compatibility #67

Triggered via pull request March 5, 2026 15:11
Status Failure
Total duration 25s
Artifacts

tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

27 errors
build (8.4, 4.3.2, 11)
Process completed with exit code 1.
build (8.2, 5.2, 11)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.2, 5.2, 11)
The operation was canceled.
build (8.3, 4.3.2, 13)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.3, 4.3.2, 13)
The operation was canceled.
build (8.3, 4.3.2, 13)
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13, found illuminate/contracts[dev-master, 13.0.x-dev (alias of dev-master), 13.x-dev] but it does not match your minimum-stability.
build (8.2, 5.2, 12)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.2, 5.2, 12)
The operation was canceled.
build (8.4, 4.3.2, 13)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.4, 4.3.2, 13)
The operation was canceled.
build (8.4, 5.2, 12)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.2, 4.3.2, 11)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.2, 4.3.2, 11)
The operation was canceled.
build (8.3, 5.2, 11)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.3, 5.2, 11)
The operation was canceled.
build (8.4, 5.2, 11)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.4, 5.2, 11)
The operation was canceled.
build (8.3, 4.3.2, 11)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.3, 5.2, 12)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.3, 4.3.2, 11)
The operation was canceled.
build (8.3, 5.2, 12)
The operation was canceled.
build (8.3, 5.2, 13)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.3, 5.2, 13)
The operation was canceled.
build (8.3, 5.2, 13)
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13, found illuminate/contracts[dev-master, 13.0.x-dev (alias of dev-master), 13.x-dev] but it does not match your minimum-stability.
build (8.4, 5.2, 13)
The strategy configuration was canceled because "build._8_4_4_3_2_11" failed
build (8.4, 5.2, 13)
The operation was canceled.
build (8.4, 5.2, 13)
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires illuminate/contracts ^13, found illuminate/contracts[dev-master, 13.0.x-dev (alias of dev-master), 13.x-dev] but it does not match your minimum-stability.