Skip to content

Commit c25fb84

Browse files
Update links
1 parent ce5d953 commit c25fb84

File tree

2 files changed

+4
-4
lines changed

2 files changed

+4
-4
lines changed

meetings/hosting.md

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -28,7 +28,7 @@ Note from Susan: Communicating w/ potential hosts may need to be a separate Team
2828

2929
Please consult the link, for further guidance.
3030

31-
Hi-speed Wireless Internet for 100% of estimated meeting attendance. Consult the [Meeting Network Requirements](/2006/03/hostnetworkrequirements.html) document for further guidance.
31+
Hi-speed Wireless Internet for 100% of estimated meeting attendance. Consult the [Meeting Network Requirements](https://www.w3.org/2006/03/hostnetworkrequirements.html) document for further guidance.
3232

3333
#### AC/TP Meetings
3434

@@ -38,7 +38,7 @@ In order to accomplish that goal:
3838

3939
1. The Meeting Planner in charge of selecting the venue shall request systems support from the Systeam leader PRIOR to the selection of the venue.
4040
2. The Systeam leader will assign a Project Leader based on locality and qualifications
41-
3. The Project Leader and Meeting Planner will prepare a requirements statement, and include the then-current version of the standard [Meeting Network Requirements](/2006/03/hostnetworkrequirements.html) document and present same to the venue's service provider (whether internal or external).
41+
3. The Project Leader and Meeting Planner will prepare a requirements statement, and include the then-current version of the standard [Meeting Network Requirements](https://www.w3.org/2006/03/hostnetworkrequirements.html) document and present same to the venue's service provider (whether internal or external).
4242
4. The Project Leader and Meeting Planner **SHOULD** meet with the network provider in order to evaluate the vendor's capability to meet the requirements.
4343
5. The Project Leader will work with the Meeting Planner to select a vendor that can most successfully meet the requirements. Should a technically unacceptable vendor be chosen nonetheless, the Systems Team cannot be expected to compensate or be held accountable for the result.
4444
6. Assuming an acceptable vendor is chosen, the Meeting Planner will facilitate technical contact between the Project Leader and network vendor, applying pressure on the venue as needed to ensure adequate continuing communication.

meetings/hybrid-meeting.md

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -208,8 +208,8 @@ https://w3c.github.io/apa/remote-meetings/
208208
Hooijberg & Watkins, [When Does It Make Sense to Have Mixed-Mode Meetings?](https://sloanreview.mit.edu/article/when-does-it-make-sense-to-have-mixed-mode-meetings/), MIT Sloan Management Review, August 25, 2021<br>
209209
https://sloanreview.mit.edu/article/when-does-it-make-sense-to-have-mixed-mode-meetings/
210210

211-
Rintel et al, [Hybrid meetings guide](https://www.microsoft.com/en-us/research/project/the-new-future-of-work/articles/hybrid-meetings-guide/), The New Future of Work, Microsoft Research, September 9, 2021<br>
212-
https://www.microsoft.com/en-us/research/project/the-new-future-of-work/articles/hybrid-meetings-guide/
211+
Rintel et al, [Hybrid meetings guide](https://www.microsoft.com/en-us/research/articles/hybrid-meetings-guide/), The New Future of Work, Microsoft Research, September 9, 2021<br>
212+
https://www.microsoft.com/en-us/research/articles/hybrid-meetings-guide/
213213

214214
W3C (various), [Remote Meetings](https://www.w3.org/wiki/Remote_Meetings), W3C public wiki, 2013-2014<br>
215215
https://www.w3.org/wiki/Remote_Meetings

0 commit comments

Comments
 (0)