Skip to content
This repository was archived by the owner on Jun 23, 2026. It is now read-only.

Prod/commcare#137

Open
Ishankoradia wants to merge 16 commits into
airbyte-masterfrom
prod/commcare
Open

Prod/commcare#137
Ishankoradia wants to merge 16 commits into
airbyte-masterfrom
prod/commcare

Conversation

@Ishankoradia

Copy link
Copy Markdown

No description provided.

@github-actions

Copy link
Copy Markdown

👋 Welcome to Airbyte!

Thank you for your contribution from DalgoT4D/airbyte! We're excited to have you in the Airbyte community.

If you have any questions, feel free to ask in the PR comments or join our Slack community.

💡 Show Tips and Tricks

PR Slash Commands

As needed or by request, Airbyte Maintainers can execute the following slash commands on your PR:

  • /format-fix - Fixes most formatting issues.
  • /bump-version - Bumps connector versions.
  • /run-connector-tests - Runs connector tests.
  • /run-cat-tests - Runs CAT tests.
  • /run-regression-tests - Runs regression tests for the modified connector(s).
  • /build-connector-images - Builds and publishes a pre-release docker image for the modified connector(s).
  • /publish-connectors-prerelease - Publishes pre-release connector builds (tagged as {version}-preview.{git-sha}) for all modified connectors in the PR.
  • /ai-review - AI-powered PR review for connector safety and quality gates.
  • /ai-docs-review - AI-powered documentation review for PRs with connector changes.
  • /ai-create-docs-pr - Creates a documentation PR for connector changes.
  • /force-merge reason="<A_GOOD_REASON>" - Force merges the PR using admin privileges, bypassing CI checks. Requires a reason.

Tips for Working with CI

  1. Pre-Release Checks. Please pay attention to these, as they contain standard checks on the metadata.yaml file, docs requirements, etc. If you need help resolving a pre-release check, please ask a maintainer.
    • Note: If you are creating a new connector, please be sure to replace the default logo.svg file with a suitable icon.
  2. Connector CI Tests. Some failures here may be expected if your tests require credentials. Please review these results to ensure (1) unit tests are passing, if applicable, and (2) integration tests pass to the degree possible and expected.
  3. (Optional.) BYO Connector Credentials for tests in your fork. You can optionally set up your fork with BYO credentials for your connector. This can significantly speed up your review, ensuring your changes are fully tested before the maintainers begin their review.
📚 Show Repo Guidance

Helpful Resources

📝 Edit this welcome message.

@github-actions

Copy link
Copy Markdown

⚠️ PR Configuration Issue Detected

Hi @Ishankoradia, thank you for your contribution from DalgoT4D/airbyte!

We've detected an issue with your PR configuration that is a barrier to effective and efficient review. To streamline your PR review and acceptance, Airbyte maintainers require the ability to push commits directly to your PR branch to apply formatting fixes, dependency updates, security patches, and other minor changes.

Specific details of the issue detected in your PR:

🏢 Organization Fork Detected

We have detected that your PR is from an organization fork rather than a personal fork. GitHub does not allow maintainers to commit directly to branches in organization forks. Learn more about allowing changes to a pull request branch created from a fork.

How to Fix:

  1. Fork the Airbyte repository under your personal GitHub account (not your organization).
  2. Push your branch to your personal fork.
  3. Create a new PR from your personal fork.

This will allow Airbyte maintainers to push any necessary fixes directly to your branch, significantly speeding up the review process.

Need Help?

If you have questions or need assistance, please:

Thank you for your understanding and for contributing to Airbyte! 🙏

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants