Skip to content

fix attachment examples #44

fix attachment examples

fix attachment examples #44

Triggered via push June 25, 2024 16:35
Status Failure
Total duration 9m 28s
Artifacts 1

build-check.yaml

on: push
Build Zenoh from source
5m 43s
Build Zenoh from source
Run unit tests on ubuntu-latest
29s
Run unit tests on ubuntu-latest
Check codebase format with clang-format
3s
Check codebase format with clang-format
Check c99 compilation
10s
Check c99 compilation
Build raweth transport on ubuntu-latest
14s
Build raweth transport on ubuntu-latest
Build and test in single thread on ubuntu-latest
29s
Build and test in single thread on ubuntu-latest
Test multicast and unicast fragmentation
3m 21s
Test multicast and unicast fragmentation
Test attachments
21s
Test attachments
Matrix: Modular build on ubuntu-latest
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Test attachments
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Test attachments
Process completed with exit code 130.
Test attachments
The operation was canceled.

Artifacts

Produced during runtime
Name Size
zenoh-0.11.0-dev-881-ge1beef1b-x86_64-unknown-linux-gnu-standalone.zip Expired
12.3 MB