fix attachment examples #44
build-check.yaml
on: push
Build Zenoh from source
5m 43s
Run unit tests on ubuntu-latest
29s
Check codebase format with clang-format
3s
Check c99 compilation
10s
Build raweth transport on ubuntu-latest
14s
Build and test in single thread on ubuntu-latest
29s
Test multicast and unicast fragmentation
3m 21s
Test attachments
21s
Matrix: Modular build on ubuntu-latest
Annotations
3 errors
Test attachments
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Test attachments
Process completed with exit code 130.
|
Test attachments
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
zenoh-0.11.0-dev-881-ge1beef1b-x86_64-unknown-linux-gnu-standalone.zip
Expired
|
12.3 MB |
|