Skip to content

chore(deps): bump the npm_and_yarn group across 1 directory with 9 up… #3723

chore(deps): bump the npm_and_yarn group across 1 directory with 9 up…

chore(deps): bump the npm_and_yarn group across 1 directory with 9 up… #3723

Triggered via push November 12, 2024 23:17
Status Failure
Total duration 15m 56s
Artifacts 2

maven.yml

on: push
Check license headers and notice
11s
Check license headers and notice
Matrix: backend
Matrix: frontend
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Node latest
Process completed with exit code 1.
Node 20
The job was canceled because "latest" failed.
Node 20
The operation was canceled.
Node 16
The job was canceled because "latest" failed.
Node 16
The operation was canceled.
Node 16.17.0
The job was canceled because "latest" failed.
Node 16.17.0
The operation was canceled.
Node 18
The job was canceled because "latest" failed.
Node 18
The operation was canceled.

Artifacts

Produced during runtime
Name Size
jacoco-report-java-11 Expired
1.77 MB
jacoco-report-java-17 Expired
1.77 MB