Skip to content

Pr io revamp

Pr io revamp #759

Triggered via pull request July 2, 2025 13:42
@yogh333yogh333
synchronize #266
pr-io-revamp
Status Failure
Total duration 4m 28s
Artifacts

ci.yml

on: pull_request
Build all Rust apps  /  Retrieve Rust Apps
1m 53s
Build all Rust apps / Retrieve Rust Apps
Check code formatting
1m 14s
Check code formatting
Matrix: Build SDK
Matrix: Run static analysis
Matrix: Run unit and integration tests
Build all Rust apps  /  Display Rust Apps
2s
Build all Rust apps / Display Rust Apps
Matrix: Build all Rust apps / Build for all targets
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Check code formatting
Process completed with exit code 1.
Run unit and integration tests (stax)
Process completed with exit code 101.
Run unit and integration tests (nanox)
Process completed with exit code 101.
Run unit and integration tests (nanosplus)
Process completed with exit code 101.
Run unit and integration tests (nanosplus)
The strategy configuration was canceled because "test.stax" failed
Run unit and integration tests (flex)
Process completed with exit code 101.
Run unit and integration tests (flex)
The strategy configuration was canceled because "test.stax" failed
Build all Rust apps / Build for all targets (app-radix-babylon, nanos+)
Process completed with exit code 101.
Build all Rust apps / Build for all targets (app-radix-babylon, nanox)
Process completed with exit code 101.