Skip to content

improved codesigning with a local installed cert #14

improved codesigning with a local installed cert

improved codesigning with a local installed cert #14

Triggered via push January 20, 2024 01:20
Status Failure
Total duration 30m 55s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

juce_ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
build (macos-latest)
Process completed with exit code 1.
build (windows-2016)
The job was canceled because "macos-latest" failed.
build (macos-latest)
Found 2 matching packages.