Test k-NN on Secure Cluster #677
test_security.yml
on: schedule
Get-CI-Image-Tag
/
Get-CI-Image-Tag
5s
Matrix: Run Integration Tests on Linux
Annotations
5 errors and 3 warnings
Run Integration Tests on Linux (11)
The job was canceled because "_21" failed.
|
Run Integration Tests on Linux (11)
The operation was canceled.
|
Run Integration Tests on Linux (17)
The job was canceled because "_21" failed.
|
Run Integration Tests on Linux (17)
The operation was canceled.
|
Run Integration Tests on Linux (17)
The operation was canceled.
|
Get-CI-Image-Tag / Get-CI-Image-Tag
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Run Integration Tests on Linux (21)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Run Integration Tests on Linux (17)
Docker pull failed with exit code 1, back off 8.802 seconds before retry.
|