Skip to content

refactored CI tests #20

refactored CI tests

refactored CI tests #20

Triggered via push May 26, 2025 21:20
Status Failure
Total duration 26s
Artifacts

main.yaml

on: push
Matrix: Run Test / Lint-Test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run Test / Lint-Test (3.11)
Process completed with exit code 5.
Run Test / Lint-Test (3.12)
The operation was canceled.
Run Test / Lint-Test (3.12)
The strategy configuration was canceled because "tests.Lint-Test._3_11" failed
Run Test / Lint-Test (3.10)
The operation was canceled.
Run Test / Lint-Test (3.10)
The strategy configuration was canceled because "tests.Lint-Test._3_11" failed
Run Test / Lint-Test (3.13)
The operation was canceled.
Run Test / Lint-Test (3.13)
The strategy configuration was canceled because "tests.Lint-Test._3_11" failed