Skip to content

8343739: Test java/awt/event/KeyEvent/ExtendedKeyCode/ExtendedKeyCodeTest.java failed: Wrong extended key code #24885

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Closed
wants to merge 5 commits into from

Conversation

alisenchung
Copy link
Contributor

@alisenchung alisenchung commented Apr 25, 2025

Test was failing on Ubuntu, looks to be a synchronous error in the test so I rewrote it to improve stability.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue

Issue

  • JDK-8343739: Test java/awt/event/KeyEvent/ExtendedKeyCode/ExtendedKeyCodeTest.java failed: Wrong extended key code (Bug - P4)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/24885/head:pull/24885
$ git checkout pull/24885

Update a local copy of the PR:
$ git checkout pull/24885
$ git pull https://git.openjdk.org/jdk.git pull/24885/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 24885

View PR using the GUI difftool:
$ git pr show -t 24885

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/24885.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Apr 25, 2025

👋 Welcome back achung! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Apr 25, 2025

@alisenchung This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8343739: Test java/awt/event/KeyEvent/ExtendedKeyCode/ExtendedKeyCodeTest.java failed: Wrong extended key code

Reviewed-by: serb, prr

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 354 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added the rfr Pull request is ready for review label Apr 25, 2025
@openjdk
Copy link

openjdk bot commented Apr 25, 2025

@alisenchung The following label will be automatically applied to this pull request:

  • client

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@mlbridge
Copy link

mlbridge bot commented Apr 25, 2025

Webrevs

robot.keyRelease(KeyEvent.VK_LEFT);
robot.waitForIdle();

if (eventsCount != 2 || !setExtendedKeyCode) {
Copy link
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I suggest to add logging here and rerun it many-many times to reproduce the bug to find out if the problem is in the wrong number of events or in the wrong extended state.

@alisenchung
Copy link
Contributor Author

I've updated the test to include logging and ran the test 200x without failures. I think it's ok to push the test with these changes so that if the test ever does fail again we can use the logs and analyze the problem.

@openjdk openjdk bot added the ready Pull request is ready to be integrated label May 5, 2025
@mrserb
Copy link
Member

mrserb commented May 6, 2025

I've updated the test to include logging and ran the test 200x without failures. I think it's ok to push the test with these changes so that if the test ever does fail again we can use the logs and analyze the problem.

I meant to run the test 200 times with logging but no other changes to find the root cause. The other changes to the test seems unnecessary at first glance. the test operations are already synchronized and delayed when necessary.

@openjdk openjdk bot removed the ready Pull request is ready to be integrated label May 8, 2025
@alisenchung
Copy link
Contributor Author

I've updated the test to include logging and ran the test 200x without failures. I think it's ok to push the test with these changes so that if the test ever does fail again we can use the logs and analyze the problem.

I meant to run the test 200 times with logging but no other changes to find the root cause. The other changes to the test seems unnecessary at first glance. the test operations are already synchronized and delayed when necessary.

I've reverted the test and added logging for the eventsCount. I've run the test thru mach5 again without failures 200x. For now adding logging to the test is probably sufficient for debugging if the failure happens again.

Copy link
Contributor

@TejeshR13 TejeshR13 left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

If you are updating the test with debug print, then its better to do it as a sub task of main bug and retain the main bug as open until root cause is found.

@openjdk openjdk bot added the ready Pull request is ready to be integrated label May 13, 2025
@alisenchung
Copy link
Contributor Author

/integrate

@openjdk
Copy link

openjdk bot commented May 14, 2025

Going to push as commit e91088a.
Since your change was applied there have been 408 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label May 14, 2025
@openjdk openjdk bot closed this May 14, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels May 14, 2025
@openjdk
Copy link

openjdk bot commented May 14, 2025

@alisenchung Pushed as commit e91088a.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
client [email protected] integrated Pull request has been integrated
Development

Successfully merging this pull request may close these issues.

4 participants