Skip to content

Merge pull request #51 from lrauschning/dev #10

Merge pull request #51 from lrauschning/dev

Merge pull request #51 from lrauschning/dev #10

Triggered via push February 27, 2025 21:06
Status Failure
Total duration 42s
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.11)
Process completed with exit code 123.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.