Skip to content

Merge pull request #4 from popyson1648/chore/setup-ci-and-pre-commit #4

Merge pull request #4 from popyson1648/chore/setup-ci-and-pre-commit

Merge pull request #4 from popyson1648/chore/setup-ci-and-pre-commit #4

Triggered via push July 15, 2025 19:40
Status Failure
Total duration 24s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (3.10)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.11)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_9" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_9" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_9" failed