SPSTRAT-630: AzureProvider: Rework draft detection #827

SPSTRAT-630: AzureProvider: Rework draft detection

SPSTRAT-630: AzureProvider: Rework draft detection #827

Triggered via pull request November 4, 2025 18:27
Status Failure
Total duration 2m 35s
Artifacts

tox-test.yml

on: pull_request
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
unit-tests (3.11)
Process completed with exit code 1.
unit-tests (3.10)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.10)
The operation was canceled.
unit-tests (3.12)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.12)
The operation was canceled.
unit-tests (3.13)
The strategy configuration was canceled because "unit-tests._3_11" failed
unit-tests (3.13)
The operation was canceled.
coverage
Process completed with exit code 1.
linting