Skip to content

Fix bug with pipe completion not working inside fn call #2422

Fix bug with pipe completion not working inside fn call

Fix bug with pipe completion not working inside fn call #2422

Triggered via pull request January 12, 2024 21:19
Status Cancelled
Total duration 1m 9s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

ci.yml

on: pull_request
Matrix: test
package
0s
package
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (ubuntu-20.04)
Canceling since a higher priority waiting request for 'refs/pull/895/merge' exists
test (ubuntu-20.04)
The operation was canceled.
test (windows-latest)
Canceling since a higher priority waiting request for 'refs/pull/895/merge' exists
test (windows-latest)
The operation was canceled.
test (macos-latest)
Canceling since a higher priority waiting request for 'refs/pull/895/merge' exists
test (macos-latest)
The operation was canceled.
test (macos-arm)
Canceling since a higher priority waiting request for 'refs/pull/895/merge' exists
test (macos-arm)
The operation was canceled.