build: Fix CI #2
ci.yml
on: pull_request
Generic pre-commit checks
15s
Mypy
15s
Matrix: tests
Annotations
9 errors
Generic pre-commit checks
Process completed with exit code 1.
|
Tests on 3.9
Process completed with exit code 1.
|
Tests on 3.8
Process completed with exit code 1.
|
Tests on 3.12
The job was canceled because "ubuntu-22_04_3_9" failed.
|
Tests on 3.12
The operation was canceled.
|
Tests on 3.10
The job was canceled because "ubuntu-22_04_3_9" failed.
|
Tests on 3.10
The operation was canceled.
|
Tests on 3.11
The job was canceled because "ubuntu-22_04_3_9" failed.
|
Tests on 3.11
The operation was canceled.
|