Skip to content

Split creation and configuration. #9956

Split creation and configuration.

Split creation and configuration. #9956

Triggered via push February 10, 2025 10:15
Status Cancelled
Total duration 4m 8s
Artifacts 1

ci.yml

on: push
Matrix: build
combine
0s
combine
external-and-flaky
0s
external-and-flaky
sign_windows
0s
sign_windows
sign_macos
0s
sign_macos
Update AUR package
0s
Update AUR package
Fit to window
Zoom out
Zoom in

Annotations

39 errors
build (ubuntu-20.04, 1)
Process completed with exit code 2.
build (ubuntu-20.04, 6)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 6)
The operation was canceled.
build (ubuntu-20.04, 4)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 4)
The operation was canceled.
build (ubuntu-20.04, 2)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 2)
The operation was canceled.
build (windows-latest, 4)
The job was canceled because "ubuntu-20_04_1" failed.
build (windows-latest, 4)
The operation was canceled.
build (windows-latest, 2)
The job was canceled because "ubuntu-20_04_1" failed.
build (windows-latest, 2)
The operation was canceled.
build (windows-latest, 1)
The job was canceled because "ubuntu-20_04_1" failed.
build (windows-latest, 1)
The operation was canceled.
build (windows-latest, 5)
The job was canceled because "ubuntu-20_04_1" failed.
build (windows-latest, 5)
The operation was canceled.
build (windows-latest, 3)
The job was canceled because "ubuntu-20_04_1" failed.
build (windows-latest, 3)
The operation was canceled.
build (ubuntu-20.04, 5)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 5)
The operation was canceled.
build (ubuntu-20.04, 7)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 7)
The operation was canceled.
build (ubuntu-20.04, 3)
The job was canceled because "ubuntu-20_04_1" failed.
build (ubuntu-20.04, 3)
The operation was canceled.
build (macos-13, 2)
The job was canceled because "ubuntu-20_04_1" failed.
build (macos-13, 2)
The operation was canceled.
rpi
Canceling since a higher priority waiting request for 'ci-refs/heads/floitsch/i2s-configure' exists
rpi
The operation was canceled.
build (macos-13, 4)
The job was canceled because "ubuntu-20_04_1" failed.
build (macos-13, 4)
The operation was canceled.
build (macos-13, 1)
The job was canceled because "ubuntu-20_04_1" failed.
build (macos-13, 1)
The operation was canceled.
build (macos-13, 3)
The job was canceled because "ubuntu-20_04_1" failed.
build (macos-13, 3)
The operation was canceled.
build (macos-13, 5)
The job was canceled because "ubuntu-20_04_1" failed.
build (macos-13, 5)
The operation was canceled.
esp32
Canceling since a higher priority waiting request for 'ci-refs/heads/floitsch/i2s-configure' exists
esp32
The operation was canceled.
cross
Canceling since a higher priority waiting request for 'ci-refs/heads/floitsch/i2s-configure' exists
cross
The operation was canceled.

Artifacts

Produced during runtime
Name Size
ccache-debug
132 KB