Skip to content

chore(deps): update dependency vitest to v4 #2681

chore(deps): update dependency vitest to v4

chore(deps): update dependency vitest to v4 #2681

Triggered via pull request November 10, 2025 23:31
Status Failure
Total duration 2h 48m 56s
Artifacts 1

ci.yml

on: pull_request
Build the package
1m 19s
Build the package
Matrix: verify-e2e
Matrix: verify-scripts
Fit to window
Zoom out
Zoom in

Annotations

6 errors
verify-e2e (playwright, 22, ubuntu-latest)
Process completed with exit code 1.
verify-e2e (playwright, 22, macos-latest)
The strategy configuration was canceled because "verify-e2e.playwright_22_ubuntu-late" failed
verify-e2e (cypress, 22, ubuntu-latest)
The strategy configuration was canceled because "verify-e2e.playwright_22_ubuntu-late" failed
verify-e2e (cypress, 22, macos-latest)
The strategy configuration was canceled because "verify-e2e.playwright_22_ubuntu-late" failed
verify-e2e (playwright, 22, windows-latest)
The strategy configuration was canceled because "verify-e2e.playwright_22_ubuntu-late" failed
verify-e2e (playwright, 22, windows-latest)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
build-output Expired
7.26 MB
sha256:6e4ae1a895cf27430f9873ae79d3b1d4ea79a69d078452d254e702112bdc51e0